| No | Project Name | Description | Client | Contract Sum/Year |
| A- HOTEL PROJECTS | ||||
| 01. | Maldives Lagoon Resort Hotel At Kaafu Atoll, North Male. | Pre-Contract & Post contract QS services | Bodufaru Beach Resort (Pvt) Ltd. | US $170 Million [2024] |
| 02. | Port City- Hotel | Client’s QS & Contract Specialist | Marina Hotel Holding (Pvt) Ltd | US $75 Million [On going] |
| 03. | Port City- Marina | Client’s QS & Contract Specialist | Colombo Marina Developments (Pvt) Ltd | US $47 Million [On going] |
| 04. | Proposed Jetwing Development At Thalahena. | Pre-Contract QS services | Jetwing Hotels (Pvt) Ltd | Rs.6.0 Billion [On hold] |
| 05. | Nilaveli Resort Development Project | Pre-contract only, PM & QS | Ideal Beach Property Developers (Pvt) Ltd | Rs.5.7 Billion [2017] |
| 06. | Proposed Resort Hotel for bodufaru’finolhu, Raa Atoll in Maldives | Pre-contract QS services | Boudufaru beach resort in Maldives | US $12.3 Million [2017] |
| 07. | Proposed Jetwing development at Thalahena. | Initial Budget Estimating | Jetwing Hotels (Pvt) Ltd | Rs.3.1 Billion [2018] |
| 08. | Proposed Resort Project at Olhuvelifushi & Embudhufuushi in Maldives | Pre-Contract & Post contract QS services | O+E Holdings (Pvt) Ltd | Rs.2.4 Billion [2009] |
| 09. | Completion of Balance Works of Ananthaya Pasikuda Resort Hotel | Post Contract QS Services | Ananthaya Pasikuda (Pvt) Ltd | Rs.1.4 Billion [2016] |
| 10. | Jetwing Hotel at Dambulla. | Pre-contract & Post contract QS services | Jetwing Hotels (Pvt) Ltd | Rs.1.2 Billion [2016] |
| 11. | Proposed Hotel Three Tips at Ella | Pre-Contract & Post contract QS services | Browns Hotels and Resorts | Rs.1.2 Billion [2026] |
| 12. | Proposed Resort & Hotel, Pasikuda | Pre-Contract QS services | Laugfs Leisure (Pvt) Ltd | Rs.1 Billion [2014] |
| 13. | Emerald Bay Hotel at Induruwa | Pre-contract & Post contract QS services | Emerald Bay Hotel (Pvt) Ltd | Rs.900 Million [2014] |
| 14. | Proposed 65 Room Extensions for the Goldi Sands Hotel at Negombo. | Pre-Contract & Post contract QS services | Goldi Sands Hotels (Pvt) Ltd | Rs.900 Million [2020] |
| 15. | Refurbishment of Occidental Eden, Beruwala | Pre-Contract and Post Contract QS services | Eden Hotel Lanka PLC | Rs.840 Million [2024] |
| 16. | Proposed 40 Rooms Hotel at Dambulla. | Pre-Contract QS services | Grand Hotels Private Limited | Rs.600 Million [2018] |
| 17. | Jetwing Hotel at Kandy | Pre-Contract & Post contract QS services | Jetwing Hotels (Pvt) Ltd | Rs.450 Million [2019] |
| 18. | Proposed Hotel at 708, Nawasigahawatta, Narigama, Hikkaduwa. | Pre-Contract & Post | Mr. K.W. Gamini & Mr. M.W. Upali | Rs.435 Million [2020] |
| 19. | Proposed Hotel for Basilur Holdings (Pvt) Ltd at Hikkaduwa. | Pre-Contract & Post | Basilur Holdings (Pvt) Ltd | Rs.400 Million [2018] |
| 20. | Proposed hotel for Urumaya hospitality (Pvt) Ltd at Tangalle | Pre-Contract and Post Contract QS services | Urumaya hospitality (Pvt) Ltd | Rs.250 Million [2026] |
| 21. | Proposed Hotel Project of Sigiriya Lake Villa | Pre-contract, Post contract services & Project Management Services. | Sigiriya Leisure (Pvt) Ltd. | Rs.308 Million [On hold] |
| 22. | Renovation of Eden Resort & Spa Beruwela | Pre-contract & Post contract QS services | Eden Hotel and Spa (Pvt) Ltd | Rs.300 Million [2014] |
| 23. | Proposed refurbishment of Club Hotel Dolphin | Pre-contract & Post contract QS services | Browns Hotels and Resorts | Rs.290 Million [On going] |
| 24. | Proposed Tangalle Surf Villa at Tangalle. | Pre-contract QS & Project Management Services. | Tangalle Leisure (Pvt) Ltd | Rs.250 Million [2016] |
| 25. | Yala Holiday homes | Pre-Contract QS services | Browns Hotels & Resorts | Rs.250 Million [On going] |
| 26. | Elephant Corridor Sigiriya | Pre-Contract & Post contract QS services | Browns Hotels and Resorts | Rs.250 Million [On going] |
| 27. | Glen Heaven at Nuwaraeliya | Pre and Post Contract QS service | Orel International Holdings (Pvt) Ltd | Rs.250 Million [On going] |
| 28. | Restoration of AYR holiday bungalow | Pre-Contract & Post contract QS services | Browns Hotels and Resorts | Rs.190 Million [On going] |
| 29. | Phase 02 of Proposed Hotel for Basilur Holdings (Pvt) Ltd at Hikkaduwa. | Pre-Contract & Post contract QS services | Basilur Holdings (Pvt) Ltd | Rs.160 Million [2020] |
| 30. | Proposed Refurbishment of Dickwella Resort & Spa | Pre-Contract and Post Contract QS services | Browns Hotels and Resorts | Rs.160 Million [On going] |
| 31. | Renovation and New Works of Dickwella Resort and Spa | Pre-Contract & Post contract QS services | Dickwella Resorts (Pvt) Ltd | Rs.143 Million [2015] |
| 32. | Proposed Calamansi Villas at Balapitiya. | Pre-contract & Post contract QS services | Three Seas (Pvt) Ltd | Rs.129 Million [2015] |
| 33. | Refurbishment of Occidental Paradise, Dambulla | Pre-Contract and Post Contract QS services | Occidental Paradise Resort | Rs.118 Million [2024] |
| 34. | Construction of Beach Bar and refurbishment of Main Restaurant at Pegasus Reef Hotel | Pre-Contract and Post Contract QS services | Pegasus Hotels of Ceylon PLC | Rs.100 Million [On going] |
| 35. | Refurbishment of Avani, Bentota | Pre-Contract and Post Contract QS services | Avani Bentota Resort | Rs.78 Million [2023] |
| 36. | Proposed 10 guest rooms renovation project for Sigiriya Hotel | Pre-Contract and Post Contract QS services | Browns Hotels and Resorts | Rs.60 Million [On going] |
| 37. | Proposed Hettich showroom at Colombo 7 | Pre-contract QS services | Hettich India (Pvt) Ltd | Rs.50 Million [2024] |
| 38. | Proposed Refurbishment of Occidental Paradise at Dambulla | Pre-Contract and Post Contract QS services | Browns Hotels and Resorts | Rs.40 Million [On going] |
| 39. | Beach Resort hotel at Unawatuna-Phase 1 | Pre-Contract and Post Contract QS services | Unawatuna Beach Resort (Pvt) Ltd | Rs.20 Million [2009] |
| 40. | Refurbishment of The Beach House by Reveal at Mirissa | Pre-Contract & Post contract QS services | Browns Hotels and Resorts | Rs.6 Million [2024] |
| 41. | Hotel Development For Four Seasons, Jeddah | Pre-Contract QS services MEP Bills of Quantities | Apexcost Consultants | Unknown [2019] |
| B – COMMERCIAL RESIDENTIAL PROJECTS | ||||
| 42. | Proposed Maldivian Capital City Development of Hotel and Apartment Complex | Contract Administration/ Pre Contract & Post contract QS services | Nasandhura Palace Hotel (Pvt) Ltd. | US$ 70 Million [2024] |
| 43. | Proposed Mixed Development at 602 606, Galle Road, Colombo 03. | Pre & Post contract QS services & Engineer to the Contract for Piling Works and up to ground level | E.A. Macro Holdings (Pvt) Ltd | Rs.15 Billion [2017] |
| 44. | Proposed Residential Development at Ward Place, Colombo 07. | Pre-Contract & Post contract QS services & Engineer to Contract | Prime Land (Pvt) Ltd | Rs.15 Billion [2024] |
| 45. | Proposed IIT University Project at Ratmalana | Pre and Post Contract QS service | Informatics Institute of Technology Limited | Rs7 Billion [On going] |
| 46. | Proposed Apartment Complex -Colombo Border Block C | BOQ Preparation & Pricing | Prime Lands Residencies (Pvt) Ltd. | Rs.4 Billion [On going] |
| 47. | Proposed Apartment Complex at Galle | Pre-contract QS services | Prime Lands Residencies (Pvt) Ltd. | Rs.2 Billion [2016] |
| 48. | Proposed Apartment Complex at Chandraleka Mawatha Colombo 8 | Bid Document, BOQ Preparation & Pricing | Prime Lands Residencies (Pvt) Ltd. | Rs.2.0 Billion [On going] |
| 49. | Proposed Apartment Complex at Mattegoda. | Pre-contract QS services | Prime Lands Residencies (Pvt) Ltd. | Rs.1.5 Billion [2016] |
| 50. | Proposed Apartment Complex at Uswetakeyyawa 02. | Pre-contract, Post contract services & Contract Administration | Prime Lands Residencies (Pvt) Ltd. | Rs.1.4 Billion [2016] |
| 51. | Proposed apartment project of ‘One Tangalle’ for Prime Land Residencies (Pvt) Ltd at Tangalle | Pre-contract QS services | Prime Land Residencies (Pvt) Ltd | Rs.1.3 Billion [2025] |
| 52. | Proposed works of luxury apartment complex at No.16, Deal place, Colombo 03. | Pre-contract & Post contract QS services | SMI Housing Development (Pvt) Ltd | Rs.1 Billion [2017] |
| 53. | Proposed Apartment Complex at Park Road. | Pre-contract & Post contract QS services | Mr. T. L. Nawash | Rs.1 Billion [2022] |
| 54. | Proposed Apartment Complex at Madinnagoda. | Pre-contract QS services | Prime Lands Residencies (Pvt) Ltd. | Rs.1 Billion [2017] |
| 55. | Proposed Apartment Complex at Kassapa Road 2 | Pre-contract QS services | Prime Lands Residencies (Pvt) Ltd. | Rs.630 Million (Cost estimate) [2019] |
| 56. | Proposed Apartment Complex at Kassapa Road. | Pre-contract QS services | Prime Lands Residencies (Pvt) Ltd | Rs.471 Million [2018] |
| 57. | Proposed Holiday Home At Yala | Pre and Post Contract QS service | LOLC Holdings PLC | Rs.410 Million [On going] |
| 58. | Proposed Four Unit Apartment Building at Bagathale. | Pre-Contract QS services | Sigiriya Residencies Private Limited | Rs.350 Million [2018] |
| 59. | Proposed additions and alterations to the unit 1 and 2 floor 16 Tower A at Empire Apartments | Pre-contract & Post contract QS services | Space Craft (Pvt) Ltd | Rs.2.1 Million [2010] |
| C – FACTORY PROJECTS | ||||
| 60. | Proposed factory Expansion at Meegoda for Orel International. | Pre-Contract & Post contract QS service | Orel International (Private) Limited | Rs.740 Million [On going] |
| 61. | Proposed Milk Separation and Powder Plant at Baduragoda. | Pre-Contract & Post contract QS service | Cargills Quality Dairies (PVT) LTD | Rs.1.2 Billion [2016] |
| 62. | Proposed Extension of Existing Factory building at 40B, EPZ, Mirigama | Pre-Contract & Post contract QS service | ATG Ceylon (Pvt) Ltd | Rs.1.5 Billion [On going] |
| 63. | Proposed factory Building at Biyagama | Pre-Contract & Post contract QS service | Dipped Products Group PLC | Rs.850 Million [2023] |
| 64. | Proposed expansion for Bulk Chocolate factory at Ranala for Ceylon Biscuits Limited | Pre-Contract & Post contract QS service | CBL Foods International Private Limited | Rs.800 Million [2022] |
| 65. | Proposed Warehouse Building at Peliyagoda | Pre-Contract QS services | Freelanka Trading (Pvt) Ltd. | Rs.750 Million [2015] |
| 66. | Proposed Flour Mixing Plant to the Existing Silos at Prima Mill at Trincomalee, Sri Lanka. | Preparation of contract Agreement/MOU | Nawaloka Construction Company (Pvt) Ltd | Rs.735 Million [2011] |
| 67. | Proposed Factory building at 40A, EPZ, Mirigama | Pre-Contract & Post contract QS service | ATG Ceylon (Pvt) Ltd | Rs.1.6 Billion [On going] |
| 68. | Proposed Addition – Capacity Improvement Project 2025 | Pre-contract & Post contract QS services | CBL Cooperate Services (Pvt) Ltd | Rs.350 Million [On going] |
| 69. | Proposed facility building at Ranala for Ceylon Biscuits Limited | Pre-contract & Post contract QS services | Ceylon Biscuits Limited | Rs.350 Million [2024] |
| 70. | Proposed New Extension to Factory at Pannipitiya, for Ceylon Biscuits Limited | Pre-contract & Post contract QS services | Ceylon Biscuits Limited | Rs.350 Million [2019] |
| 71. | Proposed Factory and Office Expansion for CBL Global Foods Limited at Alawwa | Pre-contract & Post contract QS services | CBL Global Foods Limited | Rs.265 Million [2022] |
| 72. | Alteration, Additions and Renovation to Factory Building at Katunayake FTZ for Star Garments- Passive House | Pre-contract & Post contract QS services | Star Garments Limited | Rs.264 Million [2022] |
| 73. | Proposed Chocolate and Biscuit Plant Expansion at Ranala for CBL Foods international Private Limited | Pre-contract & Post contract QS services | CBL Foods International Private Limited | Rs.250 Million [2012] |
| 74. | Proposed UHT and Yoghurt Factory building & cold room for Cargills quality dairies (Pvt) Ltd at Banduragoda. | Post Contract QS service | Cargills quality dairies (Pvt) Ltd | Rs.120 Million [2012] |
| 75. | Roof renovation of factory facilities for SDS spices (Pvt) Ltd at Kosgoda | Pre-contract & Post contract QS services | SDS Spices (Pvt) Ltd | Rs. 120 Million [2022] |
| 76. | Proposed works of factory building for Brandix Lingerie (Pvt) Ltd at Biyagama- BEPZ | Pre contract & Post contract QS services | Brandix Lingerie (Pvt) Ltd | Rs.52 Million [2014] |
| 77. | Proposed warehouse at Peliyagoda. | Pre contract & Post contract QS services | Free Lanka (Pvt) Ltd | Rs.20 Million [2015] |
| 78. | Proposed Lake Edge Building Refurbishment for Excell World | Pre contract & Post contract QS services | Millenium Development (Pvt) Ltd | Rs.12 Million [On going] |
| D – SUPERMARKETS | ||||
| 79. | Food City Projects (129 Outlets) in Sri Lanka. | Pre-Contract & Post contract QS services | Cargills Ceylon PLC | Rs.2 Billion [2016] |
| 80. | SPAR Supermarket projects (Thalawathugoda, Kalubowila, Pepiliyana, Malabe, Kelaniya, Seeduwa, Wattala) | Pre-Contract & Post contract QS services | SPAR SL (Pvt) Ltd | Rs.850 Million [2022] |
| 81. | KFC outlet Projects (25 Outlets) in Sri Lanka. | Pre-Contract & Post contract QS services | Cargills Ceylon PLC | Rs.375 Million [2016] |
| 82. | Proposed Bread Talk Outlet at Nugegoda. | Pre-Contract & Post contract QS services | Food Buzz (Pvt) Ltd | Rs.9 Million [2015] |
| 83. | Proposed Bread Talk Outlet at Rajagiriya. | Pre-Contract & Post contract QS services | Food Buzz (Pvt) Ltd | Rs.8 Million [2014] |
| 84. | Renovation to premises at No.14, Rotunda Gardens for Abdul Rahims’ new showroom | Pre-Contract & Post contract QS services | M.C. Abdul Rahims’ & bros (Pvt) Ltd | Rs.5 Million [2012] |
| E – OFFICE BUILDINGS | ||||
| 85. | Proposed Office Building for Laugfs at Maya Avenue | Pre-Contract & Post contract QS services | Laugfs Property Development (Pvt) Ltd | Rs.800 Million [2015] |
| 86. | Proposed refurbishment of Equity One building at Dharmapala Mawatha, Colombo 7 | Pre-Contract & Post contract QS services | Equity One Ltd | Rs.500 Million [On going] |
| 87. | Proposed Mixed Use Building for Sino Lanka Limited at Rajagiriya. | Pre-Contract & Post contract QS services | Sino Lanka Limited | Rs.450 Million [2024] |
| 88. | Proposed Bank Building for FLTC | Pre-Contract & Post contract QS services | Free Lanka Trading Company (Pvt) Ltd | Rs.300 Million [On going] |
| 89. | Proposed office building for Central finance PLC at No.268, Vauxhall street, Colombo 03. | Pre contract QS services | Team Architrave | Rs.175 Million [2013] |
| 90. | Proposed façade renovation for Development Holdings (Pvt) Ltd | Pre-Contract & Post contract QS services | PW Architects | Rs.150 Million [2022] |
| 91. | Proposed Mixed Development at No. 74, Park Street, Colombo 02 | Pre-Contract & Post contract QS services | Mr. Bilal Mohamed | Rs.83 Million [2020] |
| 92. | Office building for Central Finance company at Anuradhapura | Pre-Contract QS services | Team Architrave | Rs.40 Million [2010] |
| 93. | Refurbishment of 8th floor office area for Carsons Management at Janadhipathi Mawatha Colombo 1 | Pre-Contract & Post contract QS services | Carsons Management Services (Pvt) Ltd | Rs.26 Million [2025] |
| 94. | Proposed Office Building for Bibila Pradeshiya Sabha | Pre-Contract QS services | Sarath Fernando Architectural Services (Pvt) Ltd | Rs.20 Million [2010] |
| 95. | Interior fit-out for CWIT Corporate office at Shangri La | Pre-contract & Post contract QS services | Colombo West International Terminal (Pvt) Ltd | Rs.8 Million [2024] |
| F – HOSPITAL BUILDINGS | ||||
| 96. | Durdans 2022, Proposed Re-Development and Remodeling of Durdans Hospitals | Pre-contract & Post contract QS services | Ceylon Hospitals PLC | Rs.2.5 Billion [2024] |
| 97. | Lanka Hospitals Renovations and Refurbishments | Pre-contract QS services | Lanka Hospitals PLC | Rs.27 Million [2024] |
| G – HYDRO POWER PLANTS | ||||
| 98. | Proposed Rajjammana Mini Hydro Project | Pre-contract & Post contract QS services | AMSK Construction (Pvt)Ltd | Rs.320 Million [2011] |
| 99. | Proposed Mini Hydro power plant at Thebuwana. | Pre-contract & Post contract QS services | Hydro Power Free Lanka 2 (Pvt) Ltd | Rs.250 Million [2015] |
| 100. | Proposed Mini Hydro power plant at Stellenberg | Pre-contract & Post contract QS services | Hydro Power Free Lanka 3 (Pvt) Ltd | Rs.179 Million [2014] |
| H – RESIDENTIAL PROJECTS | ||||
| 101. | Proposed Residential Development at R G Senanayake Mawatha Colombo 7 | Pre-Contract and Post Contract QS services | Rahul Capital (Pvt) Ltd | Rs.6.9 Billion [2026] |
| 102. | Construction of Proposed House for Mr. Gamini Abaywickrama at Thimbirigasyaya. | Pre-Contract and Post Contract QS services | Mr. Gamini Abeywickrama | Rs.170 Million [2014] |
| 103. | Proposed Renovation Works to Estate Bungalows & Quarters for Watawala Plantation | Pre-Contract and Post Contract QS services | Watawala Plantations PLC | Rs.150 Million [On going] |
| 104. | Proposed Residence for Dr. D.U.S. Bulugahapitiya and Dr. Mrs. S.K. Kasthuriarachchi | Pre-Contract and Post Contract QS services | Dr. D.U.S. Bulugahapitiya | Rs.90 Million [2021] |
| 105. | Proposed Residence For Mr.R.A.T.P. Perera and Mrs.L.K.A.H Fernando at Kynsey Road, Colombo 07 | Pre-Contract and Post Contract QS services | Mr.R.A.T.P. Perera and Mrs.L.K.A.H Fernando | Rs.86 Million [2024] |
| 106. | Proposed 6-unit House for Mr. D.N.C. Chandrasena at Homagama | Pre-contract & Post contract QS services | Mr. D.N.C. Chandrasena | Rs.75 Million [2022] |
| 107. | Mr. & Mrs. Maheshwaran House | Pre-Contract and Post Contract QS services | Mr. & Mrs. Maheshwaran | Rs.72 Million [2013] |
| 108. | Proposed Residence for Mr. Ranjith Pandithage | Pre-Contract and Post Contract QS services | Architect Bernard Gomez | Rs.69 Million [2018] |
| 109. | Proposed Residence for Dr. Leana Anne Fernando | Pre-Contract and Post Contract QS services | Dr. Leana Anne Fernando | Rs.58 Million [2019] |
| 110. | Renovation and Refurbishment of Residence at Horton Place | Pre-Contract and Post Contract QS services | Dr. Hans Wijesuriya | Rs.55 Million [2025] |
| 111. | Proposed residence for Mark Green Holdings (Pvt) Ltd at Digana. | Pre-Contract and Post Contract QS services | Team Architrave | Rs.30 Million [2008] |
| 112. | Proposed House for Ayoma at LOT A –Bogahawatta, Bogahahena Rd, Battaramulla | Pre-Contract and Post Contract QS services | Mrs. Ayoma | Rs.25 Million [2016] |
| 113. | House for Ravi Fernando at Battaramulla. | Pre-Contract and Post Contract QS services | Team Architrave | Rs.22 Million [2008] |
| 114. | Proposed residence building at No. 07, Inner Bagathale Road, Colombo 03. | Post contract QS Services | Ms. R. R. Yaseen | Rs.22 Million [2015] |
| 115. | Proposed Renovation and Refurbishment of Houses No. 7 & No. 9 at Colombo 04. | Pre-Contract and Post Contract QS services | Space Craft (Pvt) Ltd | Rs.15 Million [2010] |
| 116. | Proposed House for Mr. Nuski Mohamad at Borella. | Pre-Contract and Post Contract QS services | Mr. Nuski Mohamad | Rs.8.1 Million [2008] |
| 117. | Kindergarten at 4 Ward Avenue, Oakleigh South Australia | Pre-Contract QS services | Berkowitz & Associates, Vic | Not determined [2023] |
| 118. | Development of 08 no of Two Storeyed Dwelling Units at Churchill Street, Heidelberg Heights | Pre-Contract QS services | Berkowitz & Associates, Vic | Not determined [2023] |
| I – OTHER PROJECTS | ||||
| 119. | Solis Hotel Project – Qatar | BOQ preparation | Qatar foundation (White Young Qatar WLL) | QAR. 1.5 Billion [2012] |
| 120. | Beach villa at Al-Ghariya | BOQ preparation | White Young Qatar WLL | QAR.56.3 Million [2011] |
| 121. | Ahmed Villa | BOQ preparation | White Young Qatar WLL | QAR.41.5 Million [2010] |
| 122. | Res Raffan Beach Vila | BOQ preparation | White Young Qatar WLL | QAR.38 Million [2011] |
| 123. | Beach Villa at Ras Laffen | BOQ preparation | White Young Qatar WLL | QAR.37.5 Million [2012] |
| 124. | Ahamed Villas | Preparation of Budgets, Preparation of Cost Plan | White young, Qatar | QAR.23 Million [2010] |
| 125. | Proposed Jaidah Building Level 7 – Qatar | BOQ preparation | White Young WLL (Jaidah investments & R.E.Dev. WLL ) | QAR.18 Million [2011] |
| 126. | Proposed Jaidah Building Level 7 | BOQ preparation | White Young WLL (Jaidah investments & R.E.Dev. WLL ) | QAR.17 Million [2011] |
| 127. | Jaidah Level One | BOQ preparation | White Young WLL (Jaidah investments & R.E.Dev. WLL ) | QAR.10 Million [2012] |
| 128. | Jaidah – Paper moon | BOQ preparation | White Young WLL (Jaidah investments & R.E.Dev. WLL ) | QAR.10 Million [2012] |
| 129. | New Doha Port Project at Qatar (NDPP) | Pre contract QS services (Document review only) | White Young Qatar WLL | [2012] |
| 130. | Beach villa at Qatar | BOQ preparation | White Young, Qatar | Rs.690 Million [2011] |
| 131. | Midmac, Qatar | BOQ preparation | Midmac, Qatar | Rs.250 Million [2009] |
| 132. | Office building for warehouse at Matugama | Preparation of Tender documents and BOQ | Warehouse & Logistics Services (Pvt) Ltd | Rs.233 Million [2008] |
| 133. | Façade Renovation for Development Holdings (Pvt) Ltd at Nawam Mawatha, Colombo 02. | Pre-contract & Post contract | Development Holdings (Pvt) Ltd | Rs.150 Million [2022] |
| 134. | Proposed Girl’s Hostel for 400 students for University of Rajarata | Q.S Consultancy services | Sripali Contractor | Rs.130 Million [2010] |
| 135. | CT Gardens Amenity Building | BOQ preparation | C T Properties Limited | Rs.80 Million [2008] |
| 136. | Seacology Training Center at Mannar | Quantity Surveying and Technical Audit | Seacology Berkeley CA. | Rs.70 Million [2018] |
| 137. | Proposed Refurbishment of Majestic city shopping complex Phase 2 | Pre-Contract QS services | Space Craft (Pvt) Ltd | Rs.63 Million [2009] |
| 138. | Proposed Refurbishment of Majestic city shopping complex Phase 1 | Pre-Contract and Post Contract QS services | Space Craft (Pvt) Ltd | Rs.50 Million [2009] |
| 139. | Proposed Basic Community Facility Building for Hali Ela Pradeshiya Sabha | Pre-Contract and Post Contract QS services | Sarath Fernando Architectural Services (Pvt) Ltd | Rs.50 Million [2010] |
| 140. | Embassy of Arab Republic of Egypt Colombo | Tender Document review | Egypt Embassy | Rs.50 Million [2010] |
| 141. | Proposed Children Orphanage House at Pilapitiya, Kelaniya. | Pre-Contract and Post Contract QS services | Team Architrave | Rs.50 Million [2009] |
| 142. | MIMIT at Thulhiriya | Pre-Contract and Post Contract QS services | Team Architrave | Rs.40 Million [2008] |
| 143. | Proposed multipurpose Building for Haputhale Urban Council | Pre-Contract QS services | Sarath Fernando Architectural Services (Pvt) Ltd | Rs.40 Million [2010] |
| 144. | Construction of Parking area & Drivers Rest Room “Bank House” Colombo 07. | Pre-Contract & Post contract QS services | Central Bank of Sri Lanka | Rs.35 Million [2015] |
| 145. | Sarvodaya Community Centre | Tender Evaluation | Sarvodaya | Rs.30 Million [2010] |
| 146. | Proposed Basic Community Facility Building for Soranathota P.S | Pre-Contract and Post Contract QS services | Sarath Fernando Architectural Services (Pvt) Ltd | Rs.20 Million [2010] |
| 147. | Construction of building for Rich colour printers exports Pvt Ltd | Initial study on LOA, agreement | CT Construction | Rs.15.5 Million [2010] |
| 148. | Interior Works of Commercial Insurance Brokers | Pre-Contract QS services | Space Craft (Pvt) Ltd | Rs.15 Million [2009] |
| 149. | Gamini Dissanayake cricket indoor nets | Pre-contract & Post contract QS services | Sri Lanka Cricket Foundation | Rs.13.5 Million [2012] |
| 150. | Proposed Building for Mr. Sanath De Silva at Elpitiya. | Tender Document and BOQ Preparation | Mr. Sanath De Silva | Rs.12 Million [2009] |
| No | Project Name | Description | Client | Contract Sum/year |
| 01. | Completion of Balance Work of Anantaya Pasikudah Resort Hote | Project Management Services | Anantaya Pasikuda (Pvt) Ltd | Rs.1.4 Billion [2016] |
| 02. | Emerald Bay Hotel at Induruwa | Project Management Services | Emerald Bay Hotel (Pvt) Ltd | Rs.900 Million [2014] |
| 03. | Proposed Office Building for Laugfs at Maya Avenue | Project Management Services | Laugfs Property Development (Pvt) Ltd | Rs.800 Million [2015] |
| 04. | SPAR Supermarket projects in S/C (Pepiliyana, Kelaniya, Seeduwa, Wattala) | Project Management Services | SPAR SL (Pvt) Ltd | Rs.520 Million [2022] |
| 05. | Proposed refurbishment of Equity 1 building at Dharmapala Mawatha, Colombo 7 | Project Management Services | Equity One Ltd | Rs.500 Million [On going] |
| 06. | Proposed Hotel at 708, Nawasigahawatta, Narigama, Hikkaduwa | Pre Contract & Post contract QS services | Mr. K.W. Gamini & Mr. M.W. Upali | Rs.435 Million [2020] |
| 07. | Proposed Storage, Production Facility & Office Complex at Peliyagoda | Project Management Services, Pre contract services. | Freelanka Trading Company (Pvt) Ltd | Rs.400 Million [2011] |
| 08. | Luxury residential building at Cambridge Place, Colombo 7 | Project Management Services | Ms. S De Silva | Rs.350 Million [2023] |
| 09. | SPAR Supermarket projects in S/C (Thalawathugoda, Kalubowila, Malabe) | Project Management Services | SPAR SL (Pvt) Ltd | Rs.350 Million [2020] |
| 10. | Proposed Hotel for Basilur Holdings (Pvt) Ltd at Hikkaduwa | Project Management Services | Basilur Holdings (Pvt) Ltd | Rs.300 Million [2021] |
| 11. | Proposed Mixed development at No.02, 6th Lane, Colombo 3 | Project Management Services | Grace Properties (Pvt)Ltd | Rs.300 Million [2011] |
| 12. | Proposed Land Development at Kohuwala, Nugegoda | Project Management Services | Atra Property Development (Pvt) Ltd | Rs.150 Million [2009] |
| 13. | Proposed Renovation and Remodeling of Guest Rooms, Kitchen and Banquette Office of Pegasus Reef Hotel | Project Management Services | Pegasus Hotels of Ceylon PLC | Rs.148 Million [2018] |
| 14. | Renovation and Refurbishment of Hotel Girithale | Project Management Services | Carsons Cumberbatch PLC | Rs.110 Million [2019] |
| 15. | Construction of Beach Bar and refurbishment of Main Restaurant at Pegasus Reef Hotel | Project Management Services | Pegasus Hotels of Ceylon PLC | Rs.100 Million [On going] |
| 16. | Proposed Mixed Development at No. 74, Park Street, Colombo 02. | Project Management Services | Mr. Bilal Mohomed | Rs.75 Million [2020] |
| 17. | Proposed Residence for Dr. Leana Anne Fernando | Project Management Services | Dr. Leana Anne Fernando | Rs.58 Million [2019] |
| 18. | Renovation and Refurbishment of Residence at Horton Place | Project Management Services | Dr. Hans Wijesuriya | Rs.55 Million [2025] |
| 19. | Refurbishment of 8th floor office area for Carsons Management at Janadhipathi Mawatha Colombo 1 | Project Management Services | Carsons Management Services (Pvt) Ltd | Rs.26 Million [2024] |
| 20. | Proposed Drainage system for Warehouse Complex in Peliyagoda | Project Management Services | Free Lanka Trading Company | Rs.17 Million [2024] |
| No | Project Name | Description | Client | Contract Sum/year |
| 01. | Proposed Sports complex with recreation, sports goods stores and retail facility at Battaramulla | Project Management Services | Development Resources Private Limited | Rs.106 Million [2019] |
| 02. | 500 bay (475 keys) five star beach resort at Beruwala | Project Management Services | Riverina Resorts (Pvt) Ltd. ; Under LOLC Leisure Ltd. | Rs.8 Billion [Suspended] |
| 03. | 45 Storey Apartment Complex at 447, Union Place | Project Management Services | Union Place Apartments (Pvt) Ltd. Under Asia Capital PLC | Rs.6.5 Billion [2022] |
| 04. | Proposed Capital Apartment at Serenia Limited | Project Management Services | Serenia Limited | Rs.1.5 Billion [2021] |
| 05. | Proposed Re-Development and Remodeling of Durdans Hospital | Consortium Services (PM Included) | Ceylon Hospitals PLC | Rs.2.5 Billion [2024] |
| 06. | Proposed Office and Apartment Complex at Park Street, Hunupitiya, Colombo 02 | Project Review | Vauxhall Colombo Private Limited | Rs.415 Million [2018] |
| 07. | Factory and Warehouse Development at Katunayake Export Processing Zone | Project Monitoring | Glowbal Outlets (Pvt) Ltd | Rs.350 Million [2015] |
| 08. | Proposed Factory Building for Farmchemie Private Limited | Project Management Services | Farmchemie Private Limited | Rs.200 Million [2023] |
| 09. | Proposed Extension and Refurbishment of facilities at Lanka Hospitals, Narahenpita | Project Management Services | Lanka Hospitals PLC | Rs.27 Million [On going] |
| No | Project Name | Description | Client | Contract Sum/year |
| 01. | Ephelia Resort Project in Seychelles | Contract Administration | Sanken Overseas | Rs.8892 Million [2009] |
| 02. | Colombo City Electricity Distribution Development Project at Colombo 2 for Ceylon Electricity Board | Contract Administration | TEPSCO | Rs.7286 Million [2009] |
| 03. | Proposed 143 rooms Negombo beach Resort Complex at Negombo | Contract Administration | Sanken Construction Pvt Ltd | Rs.1500 Million [2015] |
| 04. | Luxury Apartment Complex at Colombo 4. | Post Contract Quantity Surveying services and Contract Administration | Seeview Property Developers (Mr. S W Meewella) | Rs.800 Million [2009] |
| 05. | World Bank Funded Provincial Road Project (UP) – Contract No. UVA-02 | Contract Administration | Kumothi Engineering (Pvt) Ltd | Rs.764 Million [2010] |
| 06. | Bandarawela Haliela Road | Contract Administration | Tudawe Brothers Limited | Rs.468 Million [2009] |
| 07. | Ipologama Water Supply Project | Contract Administration | National Construction Association Sri Lanka | Rs.234 Million [2009] |
| 08. | Construction of backwash recovery facility at water treatment plant Katugasthota for National Water Supply & Drainage Board | Contract Administration | Texone Technologies (Pvt) Ltd | Rs.137 Million [2009] |
| 09. | Proposed building project for Faculty of Architecture Department of Building Economics – University of Moratuwa | Post Contract administration | Trio Construction | Rs.46 Million [2009] |
| 10. | STELCO Fourth Power System Development Project in Maldives | Contract Administration | Sanken Overseas | Rs.2.2 Million [2009] |
| No | Project Name | Description | Client | Contract Sum/year |
| 01. | Ja-ela /Ekala waste water Disposal project | Evaluations of time extension claims submitted by contractor | SWECO International AB | Rs.11400 Million [2010] |
| 02. | Construction of proposed head office building for Ceylon Petroleum corporation | Preparation of extension of time claim | Tudawe Brothers (Pvt) Ltd | Rs.1260 Million [2010] |
| 03. | Provincial roads improvement project- Eastern province (Pankulam-Kivulekada Thiriyai road) Contract No. ENCPRP/NCB/EP-05 | Preparation of extension of time claim | Tissa Builders & contractors (Pvt) Ltd | Rs.600 Million [2012] |
| 04. | Rehabilitation / Improvements to Ingiriya Ratnapura Road (A-008) | Claims for deletion of laboratory equipment/building, unprecedented increase in bitumen prices and extension of time | Wakachiku Construction Co. Limited | Rs.551 Million [2008] |
| 05. | Refurbishment of Ramada Resort at Kalutara | Preparation of extension of time claim | Sanken Lanka (Pvt) Ltd | Rs.544 Million [2012] |
| 06. | Road Improvement Project –Bandarawela Haliela Road -A 016 | Extension of Time Claim & Additional Cost Claim | Tudawe Brothers Limited | Rs.468 Million [2008] |
| 07. | Road Improvement Project –Bandarawela Welimada Road -B 044 | Extension of Time and Prolongation costs claims | Tudawe Brothers Limited | Rs.390 Million [2008] |
| 08. | Construction of office building- Pership Property Development (Pvt) Ltd | Time extension claim | Tudawe Brothers Limited | Rs.300 Million [2009] |
| 09. | 40 Housing Unit in Maradana Housing Scheme for NHDA | Preparation of Contractual Correspondence and EOT Claim | K D Ebert & Sons Holdings (Pvt) Ltd | Rs.245 Million [2008] |
| 10. | Road improvement project – Maharagama | Extension of Time and Prolongation costs claims | Tudawe Brothers Limited | Rs.235 Million [2008] |
| 11. | Ipologama Ranaviru Gammanaya | Time Extension Claim | NCASL Constructors (Pvt) Ltd | Rs.230 Million [2009] |
| 12. | Pre Clinical Building at Kelaniya | Preparation of Contractual Correspondence and EOT Claim | K D Ebert & Sons Holdings (Pvt) Ltd | Rs.200 Million [2008] |
| 13. | Construction of proposed Kelsey Residencies at No.9/4 Ruhunukala Mawatha, Colombo 08 | Time extension claim | Tudawe Brothers Limited | Rs.200 Million [2009] |
| 14. | Road improvement project – Kuliyapitiya | Extension of Time and Prolongation costs claims | Tudawe Brothers Limited | Rs.172 Million [2008] |
| 15. | Head Office building for the Department of Wildlife Conservation at Battaramulla | Additional Cost claim for suspension of Works and Termination of the Contract, Obtaining interim injunction, Technical report for arbitration, Submissions for Supreme court hearing | Ranasiha Lanka (pvt) Limited | Rs.169 Million [2007] |
| 16. | Rajjammana Mini Hydro Power Project | Contract Document review & Post-Contract, Contract Administrative | AMSK CONSTRUCTION (PVT) | Rs.160 Million [2011] |
| 17. | Construction of Hostel at Eliyakanda for University of Ruhuna | Preparation of Contractual Correspondence and EOT Claim | K D Ebert & Sons Holdings (Pvt) Ltd | Rs.150 Million [2008] |
| 18. | Construction of BOH Buildings for Aman Resort at Kudausfushhi Island in Maldives | Cost Claim | International Construction Consortium (Pvt) Ltd | Rs.145 Million [2008] |
| 19. | Storm water drainage improvement in Gampaha Municipal Council area | Time Extension Claim | Isuru Builders | Rs.140 Million [2010] |
| 20. | Housing Scheme Project at Torrington for NHDA | Additional Cost Claim | K D Ebert & Sons Holdings (Pvt) Ltd | Rs.140 Million [2008] |
| 21. | Construction of proposed head office building for Ceylon Petroleum corporation | Preparation of particulars of additional costs in extension for pilling works | Walkers (Pvt) Ltd | Rs.91 Million [2010] |
| 22. | Re construction of bridge No 8/3 & 6/3 ON Hanwella–Pugoda Urapola Road | Proposal for carrying out suspended works of Bridges, cost claim | Tudawe Brothers Limited | Rs.80 Million [2009] |
| 23. | SPC 03 / ADB Funded Road Network Improvement Project | Price Fluctuation Claim | W.G.M.M Padmini Contractors | Rs.80 Million [2010] |
| 24. | Construction of infrastructure & utilities for the new Qatar Petroleum Support Facilities at Dukhan – Qatar | Extension of Time claim | Simplex Concrete Piles Limited | Rs.80 Million [2006] |
| 25. | Road improvement project – Trincomalee – Pulmoddai road (from 47.50 km to 55.23 km) | Extension of Time and Prolongation costs claims | Wakachiku Construction Co. Limited | Rs.77 Million [2008] |
| 26. | 4 Road improvement project – Trincomalee – Pulmoddai road (from 0.00 km to 7.50 km) | Extension of Time and Prolongation costs claims | Wakachiku Construction Co. Limited | Rs.73 Million [2008] |
| 27. | Road improvement project – Veyangoda | Extension of Time claim | Ranasiha Lanka (pvt) Limited | Rs.55 Million [2007] |
| 28. | Construction Of Showroom & Office Complex For IWS Holdings (Pvt) Limited | Final account and Cost claims | Sierra Construction | Rs.55 Million [2008] |
| 29. | Road development project – Kadawatha | Cost claim for prolongation and suspension of Works | Tudawe Brothers Limited | Rs.45 Million [2007] |
| 30. | Shangrilla Project in Maldives | Preparation of Final Account and Time Extension Claim | Alysen Services (Pvt) Ltd. | Rs.45 Million [2010] |
| 31. | Improvements to CGWW road &Matara-Hakmana road (Matara Bhodiya junction) | Management of Termination of Contract – Claim | Dharmadasa Construction | Rs.42 Million [2008] |
| 32. | Reconstruction of KM/Vigneswara Vidyalaya at Karative – Ampara District | Extension of Time claim | Ranasiha Lanka (pvt) Limited | Rs.40 Million [2008] |
| 33. | Improvements to Palmadulla-Madampe – Nonagama Road | Management of Termination of Contract – Claim | Dharmadasa Construction | Rs.32 Million [2008] |
| 34. | Tambalakamama water supply project | Time Extension claim, Prolongation Cost Claim, Payment delays, Price escalation claim, Under recovery claim | Dumbara Constructions | Rs.30 Million [2009] |
| 35. | Road improvement project – Hiripitiya road, Kurunagala | Extension of Time claim | Ranasiha Lanka (pvt) Limited | Rs.27 Million [2007] |
| 36. | Road improvement project – Circular road, Kurunagala | Extension of Time claim | Ranasiha Lanka (pvt) Limited | Rs.26 Million [2007] |
| 37. | Serunuwara water supply project- Supply and laying of PVC/DI/CI pipes and pumping main | Under recovery claim for deleting major item, Loss of property claim | Dumbara Construction | Rs.25 Million [2009] |
| 38. | Improvements to CGWW road & Matara-Akuressa road at Matara (Nupe junction) Chainage 0+000 to 0+140 | Management of Termination of Contract – Claim | Dharmadasa Construction | Rs.22 Million [2008] |
| 39. | Devinuwara Pradeshiya Saba roads rehabilitation | Recovery claim for reduced scope of works | Dumbara Construction | Rs.20 Million [2009] |
| 40. | Contract for Construction of Villas in Lake Drive | Cost Claim and Time extension claim | Tudawe Brothers Limited | Rs.18 Million [2008] |
| 41. | Electrical installation works for Apartment complex at no. 38j, Vishnukovil road, Dehiwala | Additional cost claim | Majestic Electric / Nawaloka Construction | Rs.12 Million [2007] |
| 42. | Laying of DI pipes for Transmission system BOI main sump at Wijesirigama | Claim for extension of time for completion | Texon Technologies (Pvt) Ltd | Rs.11.6 Million [2008] |
| 43. | Electrical installation of Industrial Museum Building for Nerd Centre | Extension of Time and Prolongation costs claims | Majestic Electric | Rs.2.1 Million [2007] |
| No | Project Name | Description | Client |
| 01. | Arbitration for Pallekele Housing | QS services for arbitration | K D Ebert & Sons Holdings (Pvt) Ltd |
| 02. | Proposed Housing scheme, community hall and Pre- School for kurier Aid Austria (Guarantee) ltd at kathaluwa Habaraduwa | Mediation | Dharmadasa Construction & Enterprises |
| 03. | Proposed Apartments(B+G+M+7) Development project at No.201, Dharmapala Mawatha, Colombo 07 for British Living Luxury Apartments (Pvt) ltd | Writing reports for dispute agents the Employer’s Claim, Consulting works for Arbitration | Sierra Constructions ltd |
| 04. | Construction of structural part of the proposed Dawson Grand Residencies at No. 07, braybrook place, Colombo 02 | Termination for Employer’s Convenience – Claim for Termination and Negotiation | Dharmadasa Construction & Enterprises |
| 05. | Proposed three storied building for Sri Lanka Army hospital at Elvitigala Mawatha, Narahenpita | Fundamental Breach of Contract by the Client- Negotiation | Dharmadasa Construction & Enterprises |
| 06. | Southern Highway Project Package 02 | Adjudicator | RDA (Contractor Taisey Corp.) |
| 07. | Thousand Houses at Dematagoda | Additional Cost Claim and Contractor Representative for Adjudication | Link Engineering |
| 08. | P 04,P05,P08 / Improve to Rural Road in Hambantota District | Additional Cost Claim for Wrongful Termination , Contractor Representative for Adjudication | Padmini Construction |
| 09. | Tea Factory for Tea Shakthi Fund at Daraniyagala and Yatinuwara | Advisory Service for Contract Termination, Variation of Outstanding Work | ICTAD |
| 10. | Road Project at Ingiriya | EOT and Cost Claim, Contractors Representative for Adjudication | Wakachiku Construction Co. Limited |
| 11. | P 03 and P04 / ADB funded Improve to Rural Road in Hambantota District | Advice for Adjudication, Claim for Termination | W.G.M.M Padmini Contractors |
| 12. | Bandarawela Hali Ela Road | Advice for Adjudication, Claim for price escalation for bitumen | Tudawa Brothers |
| 13. | Ingiriya Rathnapura Road | Advice for Adjudication, Claim for time extension to setting out delay | Wakachiku Construction Co. Limited |
| 14. | Improvement of Kamburupitiya Market | Arbitrator | Illeperuma & Sons/ Southern Provincial Council |
| 15. | Welimada Pahala Kotawera through Kottegoda road | Arbitrator | Wijewardana Construction/Pro-Poor Rural Development Project- Uva Provincial Council |
| 16. | Design and Construction of Euro fashions office building at Teldeniya | Arbitrator | SMR Engineering/ Euro Fashions (pvt) Ltd |
| 17. | Construction of proposed municipal grand stand and pavilion for southern cricket council | Advice for Adjudication – Delay in 17 payments | Sripalie Contractors (Pvt) Ltd |
| 18. | Construction of sub structure for sewer pumping station | Advice for Arbitration for the Termination of Sub Contract | SMA Constructions |
| 19. | Construction of Tea Shakthi factory at Deraniyagala | Termination of Contract and payment delays – Arbitrator | Waterman Cons. And Tea Shakthi |
| 20. | JBIC Funded Provincial Roads Improvement Project in Central & Sabaragamuwa Provinces | Adjudicator | Consulting Engineers & Contractors (Pvt.) Ltd. |
| 21. | Proposed facilities complex for David Peris Motor Company at Ranna | Consultancy services on Arbitration | Sierra Construction (Pvt) Ltd |
| 22. | Supply and Laying of PVC & DI Pipes for distribution main for Thalawakale Lindula water supply scheme. | DAB | Brians Engineering |
| No | Project Name | Description | Client |
| 01. | Rockland – ware house & logistics | Cost Auditing | Ware house & Logistics Services ( Pvt) Ltd |
| 02. | 189 Residencies | Re measurement of External Plaster | Space Craft (Pvt) Ltd |
| 03. | Spathodia Residencies | Re measurement of External Plaster | Space Craft (Pvt) Ltd |
| 04. | Seacology Training Center at Mannar. | Quantity Surveying and Technical Audit | Seacology Berkeley CA. 94707 |
| 05. | Sarasavi Book Shop | Evaluation of Bid | Sarasavi Book Shop (Pvt) ltd. |
| 06. | Empire Project at Union Place | Re-measurement of Works- Technical Audit | C T Properties Limited |
| 07. | Kandegoda Residence | Measurement Checking | Harith Kulasinghe |
| 08. | Proposed house for Mr. Kapila Premachandra at Templar Place Mt.Lavinia | Cost Auditing | Mr. Kapila Premarathne |
| 09. | Proposed washing plant building at Katunayake | Cost Auditing | ATG Ceylon (Pvt) Ltd |